首页> 外文会议>International Conference on Power Systems Technology >Application of Pre-Shutdown AC Voltage Test System for XLPE Power Cable
【24h】

Application of Pre-Shutdown AC Voltage Test System for XLPE Power Cable

机译:XLPE电力电缆预关闭交流电压测试系统的应用

获取原文

摘要

This study deals with pre-shutdown test system in AC withstand voltage test for XLPE power cable, which is able to minimize electrical damage enough to investigate source of defects with naked eye when electrical breakdown is happened. Principle of this system is based on high speed shutdown of the test voltage just before the electrical breakdown by PBD system combined with time domain reflection (TDR) method of partial discharge. By experiments with model cables having artificial defects, its working abilities, such as shutdown speed and accuracy as well as operating condition were investigated. Through the test result of power cables with unknown defect, it was proven that this pre-shutdown AC voltage test system was successfully worked in the AC voltage test for power cable.
机译:本研究涉及交流电力电缆AC耐电压试验的预关闭测试系统,能够最大限度地减少电气损坏,以调查肉眼时肉眼的缺陷来源。该系统的原理是基于在PBD系统电击之前的测试电压的高速关闭,这些系统与时域反射(TDR)方法的局部放电。通过对具有人工缺陷的模型电缆进行实验,研究了其工作能力,例如关闭速度和准确性以及操作条件。通过具有未知缺陷的电力电缆的测试结果,证明该预关闭交流电压测试系统已成功工作在电源线的AC电压测试中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号