首页> 外文会议>Pipeline Division Specialty Conference >Installing and Operating Underground Power Distribution by Sharing Existing Pipelines, Tunnels, and Rights of Way
【24h】

Installing and Operating Underground Power Distribution by Sharing Existing Pipelines, Tunnels, and Rights of Way

机译:通过分享现有管道,隧道和方式的权利来安装和运营地下配电

获取原文

摘要

Many countries have long had the desire to move their overhead power lines to the underground due to increasing pressure from environmentalists, increasing pressure from city planners, losses from frequent outage, loss from bad weather, high cost of maintenance, high transmission loss, electrocution, bushfire risks, high greenhouse emission, auto accidents, cost of tree pruning, better aesthetics, and better real estate value. Cost and the underground already being so crowded with water pipes, sewers, storm drains, gas mains, telephone cables, and other conduits have prevented the power companies from realizing this goal. While the power industry has felt this way, the communications industry is fighting for its survival. It appears these two industries could work together for both of them to gain. Deployment of optical fiber networks or power distribution networks underground in dedicated conduits requires extensive construction, usually involving excavation of city streets. It makes all the sense in the world to locate the power distribution cables and the fiber cables in the existing rights of way on sewers, water mains, gas pipes, tunnels, and other underground structures to move them underground quicker and at a cheaper cost. This paper provides an account of how to go about deploying power and fiber cables either inside or outside of existing utility pipes using trenchless technologies. Tokyo, Taipei, Berlin, Hamburg, Paris, Toronto, Vienna, Boston, New York, Albuquerque, and Indianapolis, are among the overview of details of such creative business partnerships where the same existing conduits were used toward win-win situations for all parties involved around the world will be presented along with the results of a global survey of underground power distribution practices. Standardization efforts and workable solutions to technical problems also are given.
机译:许多国家长期以来,由于环保主义者的压力增加,从城市规划者的压力增加,频繁的中断损失,频繁的中断,恶劣的天气损失,维护成本高,传输损失高,传输损耗高,传输损失,电损失高,传输损失高,电损失高森林大火风险,高温室排放,汽车事故,树修剪成本,更好的美学和更好的房地产价值。成本和地下已经挤满了水管,下水道,风暴排水管,燃气电源,电话电缆等导管已经阻止了电力公司实现了这一目标。虽然电力行业感受到这种方式,但通信行业正在为其生存而战。看起来这两个行业可以共同努力,他们都可以获得。在专用导管的地下地下的光纤网络或配电网络部署需要广泛的建筑,通常涉及城市街道的挖掘。它使世界上的所有意义都在下水道,水管,燃气管,隧道和其他地下结构上定位配电电缆和光纤电缆,以便以更便宜的成本将它们移动到地下。本文提供了如何使用桥接技术在现有公用事业管内部或外部部署电源和光纤电缆的说明。东京,台北,柏林,汉堡,巴黎,多伦多,维也纳,波士顿,纽约,阿尔伯克基和印第安纳波利斯是如此创造性商业合作伙伴关系的详细概述,其中相同现有的管道用于各方的双赢局面将涉及世界各地的地下配电实践调查结果。还给出了标准化努力和对技术问题的可行解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号