Rehabilitation of the 80-Year-Old North Outfall Sewer (NOS) Tunnel

机译:80岁的北投表下水道(NOS)隧道的康复

获取原文

摘要

In 1990, a residential area above the North Outfall Sewer (NOS) tunnel constructed in 1924, experienced subsidence. After sewage was diverted into the North Outfall Replacement Sewer (NORS), soil probing from within the tunnel was conducted, soil-improvement options were developed, and a preferred grouting scheme was analyzed by numerical modeling to evaluate the stability of the 80-year+ old tunnel liner under grouting-induced loading conditions. This paper discusses the initial field investigation and the development and analysis of a grouting scheme originally intended to be implemented before relining of the tunnel. The scheme was later modified, and the new liner was installed before the final probing and grouting work was done.
机译:1990年,在1924年建造的北排水道(NOS)隧道之上的一个住宅区,经验丰富。在污水转移到北排水道(NORS)中,进行了隧道内的土壤探测,开发了土壤改善选择,通过数值模型分析了优选的灌浆方案,以评估80年+旧的稳定性灌浆诱导的装载条件下的隧道衬里。本文讨论了最初旨在在隧道中传递之前实施的灌浆方案的初始现场调查和开发和分析。该计划后来修改,在最终探测和灌浆工作完成之前安装了新衬垫。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号