首页> 外文会议>European Metallurgical Conference >Processing of Spent Ceramic Linings from TiAl-Castings for Yttria Recovery
【24h】

Processing of Spent Ceramic Linings from TiAl-Castings for Yttria Recovery

机译:从TiAl铸件处理废陶瓷衬里的加工yttria恢复

获取原文

摘要

The work deals with leaching of TiAl-waste under laboratory conditions and scale up of the leaching process using hydrochloric acid. The different samples were leached after crushing, grinding, and sieving with a solution of hydrochloric acid. The effects of acid concentration, agitation time, solid/liquid ratio and fraction size on the efficiency of leaching were investigated. When two hours agitation time, 10 % solid/liquid ratio and 1M hydrochloric acid were applied then the best results of the leaching of yttrium were obtained under laboratory conditions. The optimal leaching parameters were tested in 100 L reactors.
机译:该工作涉及在实验室条件下浸出TiAl废料,并使用盐酸扩大浸出过程。用盐酸溶液破碎,研磨和筛分后浸出不同的样品。研究了酸浓度,搅拌时间,固体/液体比和分数大小对浸出效率的影响。当两个小时搅拌时,施加10%固体/液体比和1M盐酸,在实验室条件下获得钇的浸出的最佳结果。在100L反应器中测试最佳浸出参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号