USE OF CONTROLLED DENSITY FILL TO FILL UNDERSLAB VOID

机译:使用受控密度填充以填充underslab空白

获取原文

摘要

During the removal of a portion of a warehouse slab for the United States Navy, a large void that was caused by water erosion was discovered. The void was created behind a concrete seawall by years of tidal and current action. Conventional granular backfill material was considered but was dismissed as being nearly impossible to install and compact. Controlled density fill (CDF) was proposed and accepted as an acceptable backfill method Access holes were drilled along the exterior of the warehouse to allow easy placement of the CDF. A bulkhead made from sandbags was installed in the void to prevent the CDF from flowing past the limit of approved work. The CDF was installed over a period of two days to lessen lateral pressure on the sand bag bulkhead and vertical pressure on the bottom of the void adjacent to the concrete seawall. By using controlled density fill, the project was successfully completed quickly and at a fraction of the original estimated cost using conventional granular backfill materials and methods.
机译:在删除美国海军的仓库板块的一部分期间,发现了由水侵蚀引起的大型空隙。在多年的潮汐和当前行动中,在混凝土海堤后面创造了空白。考虑常规的颗粒回填材料,但被驳回几乎不可能安装和紧凑。被控制的密度填充(CDF)提出并接受作为可接受的回填方法,进入孔沿仓库的外部钻孔以易于放置CDF。用沙袋制作的舱壁安装在空白中,以防止CDF流过批准工作的限制。 CDF安装在两天的时间内,以减轻砂袋隔板上的横向压力和靠近混凝土海堤的空隙底部的垂直压力。通过使用受控密度填充,使用传统的粒状回填材料和方法,该项目成功完成了原始估计成本的一小部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号