THE MIDAS PROJECT-FORMULA FOR SUCCESS

机译:Midas项目 - 成功公式

获取原文

摘要

Although this was a fast track project, most of the design had been completed before going out to bid! Site was established in February 1998 and experienced contractors were selected. Progress and costs were closely monitored and sections of the mil were pre-commissioned as/when available. The operating contract was let to Dynatec early enough to enable their operators to become fully familiar with the installation of the equipment during construction and they were fully involved during pre-commissioning and performance testing. Good vendor support, together with the experience gained by the operators, enabled the mill to reach full production and pass the performance test four weeks after ore introduction.
机译:虽然这是一个快速的轨道项目,但大多数设计都在出价前完成了!网站成立于1998年2月,并选择了经验丰富的承包商。正在监测进度和成本,并将MIL的部分预先委托/何时可用。营业合同早期让他们的运营商能够在施工期间完全熟悉设备,并且在预调试和性能测试中完全涉及它们。良好的供应商支持,以及运营商获得的经验,使工厂能够在矿床介绍后四周达到全面生产并通过性能测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号