I have some general comments on optimizing profitability based on working in heap leach operations in tropical environments. Many of my planned comments this morning have been stated earlier in the Conference. I get the opportunity to say only a few words, an follow up on some specific comments and concerns. In normal operations, stack the ore higher, where possible. The surface area of the stacked ore controls the total solution volume that can be sprayed on the pad at a specific time period. With higher lifts, solution will contact more ore particles as it percolate through the lift, and therefore the solution grade flowing through the base will be increased, whether it is freshly stacked or almost completely leached ore.
展开▼