首页> 外文会议>Randol Gold Silver Forum >COLD WEATHER HEAP LEACHING - AND UPDATE
【24h】

COLD WEATHER HEAP LEACHING - AND UPDATE

机译:寒冷的天气堆浸出 - 并更新

获取原文

摘要

The recent start-up and operation of the Brewery Creek mine has demonstrated that a heap leach facility can be operated successfully in extreme northern climates. The heap, power supply and solution application systems can be designed to incorporate sufficient flexibility and redundancy to allow safe, continuous operation throughout severe winter conditions. The results of the thermal modelling have been substantiated in the field, and indicate a number of likely approaches to optimizing the available ore stacking period.
机译:最近啤酒厂溪矿的启动和运作表明,堆浸出设施可以在极端北部气候中成功运行。堆,电源和解决方案应用系统可以设计成具有足够的灵活性和冗余,以允许在严重的冬季条件下安全,连续运行。热建模的结果已经在现场证实,并指出了优化可用矿石堆叠时段的许多可能方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号