首页> 外文会议>Randol Gold Silver Forum >ENVIRONMENTAL PERMITTING AND COMPLIANCE FOR MINE SITE DEVELOPMENT IN UZBEKISTAN AND THE CIS
【24h】

ENVIRONMENTAL PERMITTING AND COMPLIANCE FOR MINE SITE DEVELOPMENT IN UZBEKISTAN AND THE CIS

机译:乌兹别克斯坦和CIS的矿山地点发展的环境允许和依从性

获取原文

摘要

Mining project development, permitting, environmental regulatory and compliance issues in Uzbekistan and the CIS are every bit as complex as those in the western world. The vast array of environmental permitting, monitoring and reporting regulations for mine project development and operation in the CIS are based on existing Soviet environmental regulations and policies which have remained in place after these countries gained independence from the former Soviet Union. The approach to mine project permitting in the CIS differs from the western world. Similar pre-feasibility, baseline data collection, and environmental monitoring requirements allow the project proponent to coordinate preparation and submission of documentation to support project permitting for Uzbek regulatory requirements with environmental requirements imposed by financial institutions and western environmental compliance structures. Implementation of generally accepted western environmental best management controls and monitoring into mine design, construction, and operation will not, however, ensure automatic compliance with Uzbek environmental regulations. Uzbek environmental compliance requirements that differ from western requirements include: 1) development and maintenance of an environmental database constructed specifically to address annual, biannual and quarterly statistical reporting requirements for emissions of "environmental pollutants" from the facility into air, surface water, ground water and soil; 2) preparation and submittal of specific permits for water utilization, hazardous waste storage and disposal, landfill construction and operation, and stack emissions inventories; and 3) procurement of approvals from the Uzbekistan State Committee for Nature Protection (generally analogous to the US Environmental Protection Agency). This paper outlines and summarizes the regulatory requirements for mine site permitting and the procedures for environmental monitoring and reporting during mining operation in Uzbekistan and the CIS.
机译:采矿项目的开发,许可,乌兹别克斯坦和独联体国家环境监管及合规问题是每一位一样复杂在西方世界。的环境许可,监督和报告防雷工程的开发和运营独联体法规繁多基于现有苏联的环境法规和仍然在发生之后,这些国家从苏联获得独立的政策。该方法开采项目从西方世界独联体允许不同。类似的预可行性研究,基础数据收集和环境监测的要求让项目倡议者协调文档的编写和提交支持项目许可与金融机构和西方的符合环保要求的结构征收环保要求乌兹别克监管要求。普遍接受的西方环境最好的管理控制执行和监测到矿井设计,施工和运营不会,但是,确保自动符合乌兹别克斯坦的环保法规。从西方的要求各不相同乌兹别克环保合规性要求包括:1)从设施到空气,地表水,地下水专门构建为“环境污染物”排放地址每年,每半年和季度统计报告的要求开发和维护环境的数据库和土壤; 2)制备和特定许可证水利用率,危险废物贮存和处置,垃圾填埋场的结构和操作,以及堆排放清单提交; 3)采购从乌兹别克斯坦国家自然保护委员会(一般类似于美国环境保护局)的批准。本文概述和总结了矿区的监管要求许可和环境监测和乌兹别克斯坦和独联体采矿作业期间报告的程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号