首页> 外文会议>Annual Meeting Exhibition of The Minerals, Metals Materials Society >Outotec Gypsum Removal Circuit and Outotec Cooling Tower Performance in Neutral Solution Cooling
【24h】

Outotec Gypsum Removal Circuit and Outotec Cooling Tower Performance in Neutral Solution Cooling

机译:Outotec石膏清除电路和outotec冷却塔性能在中性溶液冷却中

获取原文

摘要

In a gypsum removal process, a solution which is saturated with calcium is cooled to lower temperature with solution cooling towers to precipitate calcium as gypsum (CaSO_4 ? 2H_2O) and remove it before the next process step. In zinc refineries, gypsum removal is part of the solution purification step before electrowinning. Gypsum removal after leaching is important to control the maintenance load of the downstream equipment. Outotec gypsum removal plant was started in 2018 as a part of the zinc Direct Leaching plant in Torreon, Mexico. The plant utilizes Outotec cooling towers for solution cooling and Outotec high rate thickener for solid particle separation from the solution flow. First operation results are showing efficient gypsum removal from the solution flow. In this paper is presented the Outotec gypsum removal process and shows results from operation and discusses the importance of efficient operation and low emissions from the solution cooling.
机译:在石膏去除过程中,用钙饱和的溶液冷却至较低的温度,用溶液冷却塔将钙作为石膏(CasO_4?2H_2O)沉淀,并在下一个工艺步骤之前将其除去。在锌炼油厂中,石膏除去是电键溶液前溶液纯化步骤的一部分。浸出后的石膏去除对于控制下游设备的维护负荷非常重要。 Outotec石膏清除植物于2018年开始作为墨西哥托雷蒂锌直接浸出厂的一部分。该工厂利用Outotec冷却塔用于溶液冷却和Outotec高速率增稠剂,用于从溶液流中的固体颗粒分离。第一操作结果显示从溶液流中呈现有效的石膏。本文介绍了Outotec石膏去除过程,并显示了操作的结果,并讨论了溶液冷却中有效操作和低排放的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号