首页> 外文会议>Annual Waste Management Conference >Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495
【24h】

Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495

机译:综合洗手辅助处理初步物流造型应急再利用系统 - 19495

获取原文

摘要

We employed Analysis of Mobility Platform (AMP) and GoldSim software to model the logistics of deploying materials to implement the Integrated Wash Aid Treatment Emergency Reuse System (IWATERS) in a hypothetical cesium-contamination scenario covering a four-block strip of downtown Chicago, IL. In this deployment of IWATERS, buildings were washed down via fire-hosing and contaminated wash solution was collected in the city's waste/stormwater collection system. The contaminated wash water was treated to remove Cs via ad hoc sand/clay filtration beds, and the treated wash solution was recycled during continuing decontamination operations. A detailed task timeline for the IWATERS deployment and information (or assumptions) on the availability and location of required resources for operations provided input parameters, as well as a framework, to enable the AMP and GoldSim simulations. From the decision to deploy IWATERS to the end of operations, including the completion of processing all contaminated wash water, took 49 days with decontamination teams active for 35 days and treatment bed teams active for 37 days. The modeling results showed the availability of vermiculite clay (based on data supplied by its commercial vendors/distributors) as the limiting factor for deploying treatment bed teams and, consequentially, the recycling rate of wash water and the timeline for decontamination operations. These simulations represent the first attempt at understanding the material and personnel requirements for large-scale IWATERS operation.
机译:我们采用了移动平台(AMP)和Goldsim软件的分析,以模拟部署材料的物流,以实现覆盖一条四块芝加哥,IL的四层块污染场景中的综合洗手辅助治疗紧急再利用系统(IVaters) 。在这种部署的IWATERS中,建筑物通过消防杂液和污染的洗涤溶液在城市的废水/雨水收集系统中进行了洗涤。通过ad hoc砂/粘土过滤床处理污染的洗涤水以除去Cs,并在继续净化操作期间再循环处理过的洗涤溶液。关于IWATERS部署和信息(或假设)的详细任务时间表,用于操作的可用性和所需资源的所需资源的位置提供了输入参数,以及框架,以启用AMP和Goldsim模拟。从决定部署IWATERS到业务结束时,包括完成处理所有受污染的洗涤水,49天用净化团队活跃35天,治疗床球队活跃37天。建模结果表明,蛭石粘土的可用性(根据其商业供应商/分销商提供的数据)作为部署治疗床团队的限制因素,并因此,洗涤水的回收率和去污作用的时间表。这些模拟代表了了解大型IWATERS操作的材料和人员要求的首次尝试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号