首页> 外文会议>International Conference on Sustainable Environment and Architecture >Waste to Energy (WTE) Putri Cempo As Urban Innovation: A Financial Analysis
【24h】

Waste to Energy (WTE) Putri Cempo As Urban Innovation: A Financial Analysis

机译:浪费能源(WTE)Putri CeMPO作为城市创新:财务分析

获取原文

摘要

The handling of waste problems in urban areas of Surakarta, Putri Cempo Final Disposal Site (TPA) has been overload since 2005. The limitness of land has made the Government of Surakarta to think of innovation by building Waste to Energy plant project. The analysis was done by using secondary data obtained from the Enviromental Departement of Surakarta and PT Metro Plasma Power imagery as a consortium of contractors project, the calculation of NPV, IRR and B/C ratio to show the feasibility study of urban waste treatment innovation. The calculation results showed that the NPV is Rp 1,502,724,992,382 the IRR is 8,174% and B/C ratio is 2,177. According to the results of the calculation, it can be concluded that the construction of PLTSa Putri Cempo in Surakarta is feasible and give return to the investment value within 15 year. Waste generation problems can eventually be solved by innovation that produce profitable byproduct outputs. The innovation which is in the form of waste handling method will take Surakarta a step further in the development of sustainable and environmentally friendly urban infrastructure.
机译:自2005年以来,Surakarta城市地区废物问题的处理已经过度了。土地的限制使Surakarta政府通过建造废物对能源工厂项目来思考创新。通过使用从Surakarta和Pt Metro Plasma Power Imagery的环境部门获得的二级数据作为承包商项目的联盟,计算NPV,IRR和B / C比率的二级数据来完成分析,以表明城市废物治疗创新的可行性研究。计算结果表明,NPV为RP 1,502,724,992,382,IRR为8,174%,B / C比为2,177。根据计算结果,可以得出结论,苏拉卡省PLTSA Putri CeMPO的建设是可行的,并在15年内返回投资价值。浪费生成问题最终通过产生盈利副产品产出的创新来解决。采用废物处理方法形式的创新将在可持续和环保的城市基础设施的发展中进一步迈出苏克塔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号