首页> 外文会议>International Conference on Petroleum Technology and Petrochemicals >Optimization of Drilling Parameters with Aid of Real Time Data for Buzargan Oil Field
【24h】

Optimization of Drilling Parameters with Aid of Real Time Data for Buzargan Oil Field

机译:借助于Buzargan油田的实时数据钻探参数优化

获取原文

摘要

This paper showed how real-time data that obtained during drilling operation can be used for optimizing drilling parameter such as weight on bit(WOB),and rotary speed(RPM)in term of drilling cost per foot.The real-time data that obtained from mud logging unit included the rate of penetration(ROP),WOB,RPM,depth.....etc.In this work,the real-time data obtained from Buzurgan oil well(BU-50)were used for drilling optimization.Rock strength for each drilling foot of section obtained from a sonic log,using SPSS(Statistics)software to calculate it correction factors a,b,and c for Mishrif formation and apply nonlinear regression method after that make drill behind for validation purpose.Finally,the optimal drilling parameters were estimated with the cost model.Based on the results obtained,a good agreement achieved between results of rate of penetration that obtained from drilling model and actual penetration rate along the drilling section.Also,cost analysis shows that the optimal weight on bit and rotary speed for drilling that section are 18 klb and 116 rpm respectively which achieves a minimum cost per foot.
机译:本文展示如何实时数据钻井操作期间获得的可用于参数,例如优化钻井如钻头上的重量(WOB),和旋转速度(RPM)在每foot.The实时数据钻井成本的术语,其获得从泥浆测井单元包括渗透的(ROP)的速率,WOB,RPM,深度..... etc.In这项工作中,从Buzurgan油井(BU-50)中得到的实时数据被用于钻井的优化。岩石强度,用于从声波测井获得部分的每个钻孔脚,使用SPSS(统计)软件计算它校正因子A,b,以及用于形成Mishrif c和后面进行验证purpose.Finally,使钻头后应用非线性回归方法,最佳钻孔参数与model.Based上获得的结果的成本估计,即从沿钻孔钻模型与实际的渗透率得到section.Also,成本分析显示穿透速率的结果之间取得了良好的协议,所述最佳权重b上它和用于钻井该部分转速是18 KLB和116分别转速这实现每英尺的最小成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号