Behavior of photovoltaic systems connected to the distribution network. Case study, photovoltaic power plants in the distribution network of the SDEE Mures operator

机译:连接到配电网络的光伏系统的行为。案例研究,SDEE Mure operator的分配网络中的光伏发电厂

获取原文

摘要

Today, the stability of the power distribution system is influenced by the significant number of photovoltaic power plants connected to the electric distribution network. This paper aims to present the results obtained after about three years of operation of a photovoltaic plant of (2.5-3,2) MW in terms of voltage variation in the common point of connection, power quality. Also, will present results of photovoltaic power plant certification, environmental factors that contributed to the production of electricity, responsiveness to change in the scheme of operation of the electricity distribution network. The case study refers to a single 2.8 MW photovoltaic plant, but it will review the operation of two more plants 2,8 MW located in different geographical areas, but with the same power, type of inverters and photovoltaic panels from one supplier. The data obtained will be teaching material when designing and simulating the operation of a new photovoltaic power plant.
机译:如今,配电系统的稳定性受到连接到配电网络的大量光伏发电厂的影响。本文旨在介绍在公共连接点的电压变化,功率质量方面大约3年的光伏植物经运行(2.5-3,2)MW的操作。此外,将呈现光伏电厂认证的结果,为电力生产导致的环境因素,对电力分配网络运行方案的反应变化。案例研究指的是单个2.8兆瓦的光伏厂,但它将审查位于不同地理区域的两个植物2,8 MW的操作,但是采用相同的电源,逆变器和来自一个供应商的光伏电池板。在设计和模拟新光伏发电厂的操作时,所获得的数据将是教材。

著录项