首页> 外文会议>World Conference on Associated Research Centers for the Urban Underground Space >On the behavior of the overcut and stuck effects during pipejacking
【24h】

On the behavior of the overcut and stuck effects during pipejacking

机译:对管扒术期间的超勾和卡住效应的行为

获取原文

摘要

No-Dig constructions in the city might encounter of various difficulties. And the difficulties or obstacles, which might cause schedule delays and damage to the pipes. Among the others, the conditions of overcut and stuck could be the most common and critical to a pipejacking project. This study considered various difficult conditions, including different overcut range and sticking position, together with different resistance, jacking force, etc. The ABAQUS finite element software was applied for three-dimensional numerical simulations for pipe-jacking with different difficult situations. The analyses focused on the pipejacking in gravel formations, and the suggestions were concluded based on the results. The results suggest that the location of sticking and its severity (different frictional coefficient was set) affect the stress field in the pipe. And the worst condition, i.e., the totally stuck, the adjacent soil and pipe will experience excessive deformation, which must be avoided. Therefore, lubrication to avoid this extreme scenario is essential in the pipejacking operation. For the case with large diameter, unavoidable overcut and highly variable geology, the above suggestions are more crucial.
机译:城市的无挖掘结构可能会遇到各种困难。和困难或障碍可能导致水管延迟和损坏。在其他人中,对管道项目的过度和卡住的条件可能是最常见的,对管道项目最为普遍和至关重要。该研究考虑了各种困难的条件,包括不同的过垂范围和粘附位置,以及不同的电阻,起重力等。ABAQUS有限元软件应用于具有不同困难情况的管道上的三维数值模拟。分析集中在砾石形成中的管袋,并根据结果结束了建议。结果表明,粘附的位置及其严重程度(设定不同的摩擦系数)影响管道中的应力场。而最糟糕的条件,即完全被困,相邻的土壤和管道将经历过度变形,这必须避免。因此,润滑以避免这种极端场景在管道操作中至关重要。对于直径大,不可避免的过度和高度可变地质的情况,以上建议更为重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号