【24h】

Optimization of Cycle Time in an Assembly Line Balancing Problem

机译:优化装配线平衡问题的循环时间

获取原文

摘要

Assembly line is a sequential work flow production systems which are still typical in the mass production of standard products. In mixed model assembly line system, it can produce the production sequentially by mixing more than one product on the same line. Different range of products are produced on the same line are quiet similar to the main product This paper proposes an approach to the mixed model assembly line balancing problem (MALBP) with parallel workstations. Different methods are developed to solve assembly line balancing problems. The existing methods to solve assembly line balancing problem cannot be applied to combinatorial type problems. When we use heuristics methods for a combinatorial type problem which has more number of work elements, it may not give an optimal solution and become tedious. So this paper is aimed to propose a method to solve such type of complex line balancing problems.
机译:装配线是一种顺序工作流量生产系统,仍然典型的标准产品。在混合模型装配线系统中,它可以通过在同一条线上混合多于一个产品来依次产生生产。不同范围的产品是在同一条线上产生的,类似于主要产品,本文提出了一种具有并行工作站的混合模型装配线平衡问题(MALBP)的方法。开发了不同的方法来解决装配线平衡问题。解决装配线平衡问题的现有方法不能应用于组合类型问题。当我们使用具有更多工作元素的组合类型问题的Heuuristics方法时,它可能无法提供最佳的解决方案并变得繁琐。因此,本文旨在提出一种解决这些类型的复杂线平衡问题的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号