【24h】

Automated Light Metro for Honolulu

机译:檀香山的自动光线

获取原文

摘要

Generally, the system performance is one of the key aspects for the success of the project. Since an Automated Light Metro (ALM) can be designed to act much like an APM on a larger scale, defining such expectations such as top speed and distance between stations etc. is critical to the success of the project. Also, federal requirements such as ADA and Buy America must be accomplished within the system performance requirements. Guideway equipment, like substations and switches, take more room than its APM counterpart. Also, locations are limited by existing intrastucture which causes one to make compromises in such things affecting system performance. Many times, in elevated systems such as the Honolulu ALM, extreme or unusual elevation changes can not be avoided due to existing utilities or other transportation networks such as buses and planes. Generally, interfaces to other organizations such as fire and police may be more involved and time consuming to implement. In elevated systems, coordination with street running equipment such as traffic signaling are more simplistic involving system operations but have to be dealt with eventually during construction. The contract packaging for Honolulu ALM is very unique and worth noting in detail. The success of the project lies squarely on the shoulders of the train and system supplier known as the Core System Contractor (CSC). The CSC is packaged in such as way as to provide all the vital systems such as Fare Collection, Signaling, Traction Power, Station Equipment, Operations Central Control and Maintenance Storage Facility fitout. Other contractors are involved to build stations and guideway with ultimately the CSC taking over the entire infrastructure to maintain and operate for a fixed price and set number of years. The specification for a typical ALM system such as Honolulu involved writing a specification which would not limit the Proposers in the ALM arena and focusing on the possibility of a later add on of the system without issues of proprietary designs and obsolescence of equipment. Usually, due to the number of contractor and designers on the project providing station, facilities and guideway design, a 30% complete design was offered during the request for proposal process. This design also must not limit the Proposers in the local area. In addition, what makes it even more challenging in Honolulu's case was there was only a city organization and not an existing authority such as a Metro or an Airport Authority to lay down exiting standards for design and construction. All this was developed during the procurement, design and construction phases.
机译:一般情况下,系统性能是该项目成功的关键因素之一。由于一个自动光地铁(ALM)可以被设计成作用就像以较大比例的APM,定义这样的期望,如最高速度和站之间的距离等对项目的成功至关重要。此外,联邦政府的要求,如ADA和购买美国货必须在系统性能要求来完成。导轨设备,如变电站和开关,花费比其对应的APM更多的空间。另外,位置由现有intrastucture其中原因之一,使在影响系统性能的这样的事情妥协的限制。很多时候,在提升系统,如檀香山ALM,极端或不寻常的高度变化无法避免,由于现有的实用程序或其他运输网络,公共汽车和飞机。一般情况下,向其他组织,如消防和警察接口可以更多地参与和耗时的实施。在高架系统,街头运行的设备,如交通信号协调更简单,涉及的系统操作,但必须在施工期间最终处理。檀香山ALM合同包装非常独特,值得一提的细节。该项目的成功,完全在于对称为核心系统承包商(CSC)的火车和系统供应商的肩上。该CSC被封装在诸如方式提供所有重要的系统,如售检票系统,信号,牵引供电,工位器具,操作中央控制和维护储存设施fitout。其他承包商参与打造站和导轨与最终CSC接管整个基础设施维护和固定价格和年定数进行操作。如檀香山典型的ALM系统规范参与编写规范这不会限制提议者在ALM领域和重点的可能性系统的无专利设计和设备陈旧的问题在以后添加上。通常情况下,由于承包商和设计师对项目提供站,设施和轨道的数字化设计,是为提案处理请求时提供30%的完整的设计。这种设计也不能限制当地的提议者。此外,让他更在檀香山的情况下,具有挑战性的是,只有一个城市的组织,而不是现有的权力,如地铁或机场管理局放下退出设计和建设标准。所有这一切都在采购,设计和施工阶段的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号