首页> 外文会议>International Waste Management and Landfill Symposium >TRANSFORMATION OF A HAZARDOUS WASTE LANDFILL INTO A COHESIVE NATURAL AREA FOR THE PUBLIC’S BENEFIT
【24h】

TRANSFORMATION OF A HAZARDOUS WASTE LANDFILL INTO A COHESIVE NATURAL AREA FOR THE PUBLIC’S BENEFIT

机译:将危险废物填埋场转化为公众利益的凝聚力自然区域

获取原文

摘要

The landfill at Klintholm for disposal of hazardous waste is owned and operated by NORD Group. Due to changes in the regulations for landfills in Denmark and due to change in ownership of the site, NORD Group decided to stop operation in 2008. In the period from 2008 to 2013, negotiations with the relevant authorities resulted in a closure plan for the area. The closure activities on site commenced in spring 2014, and closure of the hazardous waste landfill was completed by June 2015. The closure project has been planned with respect to the declared areas' outstanding natural beauty, transforming the landfill area into a recreational and natural locality, which also maintains the area as a cultural landscape (former disposal area for hazardous waste), and at the same time ensuring protection of the environment in the future. The keyword for the closure project is adding value to the area at Klintholm along with an ongoing monitoring of the impact on the environment to ensure that no additional mitigating measures are required. A monitoring system for groundwater, surface water, the leachate and indirectly the marine recipient verify that the effluent standards are met.The total costs for closure of the hazardous waste landfill at Klintholm was 1.3 million Euro. In addition to the closure costs, a financial security at approximately 13 million Euro has been founded to cover the aftercare expenses in the succeeding 60 years after closure.
机译:在克林特霍尔姆处置的危险废物填埋场拥有和NORD集团经营。由于在丹麦和由于网站的所有权变化填埋法规的变化,NORD集团决定于2008年停止工作在2008年至2013年期间,与相关部门谈判的结果是该地区一个关闭计划。在现场的封闭活动,2014年春季开始,并完成了危险废物填埋场的关闭,到2015年六月截流工程已规划关于申报地区杰出自然风景区,改造填埋区为休闲和自然的地方,这也保持了区域作为一个文化景观(危险废物处置前区),并同时保证在未来保护环境。对于关停项目的关键字在克林特霍尔姆与对环境的影响的不断监测沿着增值的区域,以确保不需要额外的缓解措施。地下水,地表水,渗滤液和间接海洋收件人的监测系统验证的污水排放标准是在克林特霍尔姆的危险废物填埋场封met.The总成本为1.3亿欧元。除了关闭成本,在大约13亿欧元金融证券已经建立覆盖善后费用在关闭后随后的60年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号