首页> 外文会议>International ATS Steelmaking Conference >Commissioning of a new heavy gauge downcoiler at ArcelorMittal Fos/Mer Hot strip Mill
【24h】

Commissioning of a new heavy gauge downcoiler at ArcelorMittal Fos/Mer Hot strip Mill

机译:在ArcelorMittal FOS / MER热带磨机中调试新的重型计量落水器

获取原文

摘要

In August 2006, the new heavy gauge downcoiler "B4" was successfully installed and started-up at the Fos/Mer Hot strip Mill, after the 12-day annual stoppage. This equipment was engineered in collaboration with Siemens VAI MT France and manufactured at the Siemens VAI Montbrison workshop. This 4-wrapper hydraulic downcoiler is more specifically dedicated to the heavy gauge pipe grades market for oil/water transport application and is designed for processing coils up to 1850x25,4 mm~2 in X70 grade, which makes it the most powerful hot strip downcoiler in the world at present.
机译:2006年8月,在12天的年度停机停止后,在FOS / MER热带磨机上成功安装和启动了新的重型规格升降机“B4”。该设备与西门子Vai Mt France合作,并在西门子Vai Montbricon Workshop制造。这款4包装液压井机更具体地专用于石油/水运输应用的重型管道等级市场,并设计用于X70级的加工线圈,最​​高可达1850×25,4 mm〜2,这使其成为最强大的热轧带材目前在世界。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号