【24h】

HDD DEALMAKERS AND DEALBREAKERS

机译:HDD销毁和销毁者

获取原文

摘要

Advantages of HDD have become widely known, prompting more diverseapplications and feasibility evaluations. While many site specific conditions contribute to thebasis of chosen installation technologies, a few hinge issues can often serve as key determinantsfor selecting HDD. Six hinge issues are discussed in the context of a collection of case histories,some where HDD was selected, and some where HDD was initially preferred but in the end wasnot used. Issues include constraints by the user and from site, soil, structural, hydraulic andenvironmental aspects. Chosen case histories include a broad range of pipeline sizes andapplications. Contrasting examples are given for how the technology decisions developed, werecontractually assigned, and how projects were concluded. Comparison summaries are providedand conclusions are made to help identify when clear HDD advantages or obstacles and riskfactors are present. Comparisons include open trench, microtunneling, pipebursting and CIPP.
机译:HDD的优点已广为人知,促使更多样化的培养和可行性评估。虽然许多站点特定条件贡献了所选安装技术的基础,但是一些铰链问题通常可以作为选择硬盘的关键决定因素。在案例历史集合的上下文中讨论了六个铰链问题,其中一些HDD在其中选择了HDD,其中HDD最初是优选的,但在使用的结束时使用。问题包括用户和现场,土壤,结构,液压环境方面的限制。选择的案例历史包括广泛的管道尺寸和应用。给出了对比实施例,了解技术决策如何发展,正在分配,以及如何结束项目。比较摘要是提供结论,以帮助识别存在清晰的HDD优点或障碍物和风险件。比较包括开放式沟槽,微管,管道和CIPP。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号