首页> 外文会议>Engineers Society of Western Pennsylvania Annual International Bridge Conference >Design and Construction of the Chao Phraya River Cable-Stayed Bridge
【24h】

Design and Construction of the Chao Phraya River Cable-Stayed Bridge

机译:湄南河斜拉桥设计与建设

获取原文

摘要

The Chao Phraya River Crossing of the South Outer Bangkok Ring Road (SOBRR) is located on the south side of Bangkok, Thailand. The main span of the bridge is 500 m. This bridge has two A-shaped towers. The steel composite superstructure is built integral to the 6 anchor piers. Design provides access to all major bridge components, such as cable anchors in the tower and edge girder that allows inspection without any special equipment or falsework. Construction started in 2004 and the structure has been completed in May 2007. The contractor uses twin erection gantry to erect each superstructure segments.
机译:湄浦河河横渡南外曼谷环路(Sobrr)位于泰国曼谷的南侧。桥的主要跨度为500米。这座桥有两个形状的塔楼。钢复合上部结构是由6个锚墩的整体构建。设计提供对所有主要桥接组件的访问,例如塔架和边缘梁中的电缆锚,允许在没有任何特殊设备或误操作的情况下检查。建设于2004年开始,该结构已于2007年5月完成。承包商使用双架架龙门直接每个超山部门。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号