Dredged material management in immersed tube tunnel construction

机译:浸入管隧道施工中的疏浚物资管理

获取原文

摘要

Four case histories are described approximately 10 years apart, where unique solutions were implemented in the disposal of dredged materials for immersed tube tunnel construction. The earliest project in the 1970s used the dredged materials to construct a manmade island for the Second Hampton Roads Crossing in Virginia. The second project, the Fort McHenry Tunnel in Baltimore, built in the 1980s, separated clean and contaminated sediments and used the materials to reclaim the nearshore confined disposal facility (CDF) as a modern container terminal. The third, the Ted Williams Tunnel built in the 1990s in Boston Harbor, used large scale solidification/stabilization for contaminated sediments in an upland CDF. The most recent project, the Marmaray Rail Tunnel Crossing under the Bosphorus, will utilize a CDF for contaminated sediments - the first facility of its type in Turkey. The four projects illustrate a dramatic increase in dredging and disposal costs in the past three decades due primarily to continually tightening environmental restrictions. Furthermore, the escalating disposal costs threaten the economic feasibility of an otherwise attractive method of subaqueous tunnel construction.
机译:四个案例历史相隔大约10年,其中在处理疏浚管隧道施工的疏浚材料中实施了独特的解决方案。 20世纪70年代最早的项目使用疏浚材料来建造一个弗吉尼亚横渡的第二个汉普顿道路的人造岛屿。第二个项目是巴尔的摩堡的曼亨利隧道,建于20世纪80年代,分离干净,污染的沉积物,并利用这些材料回收近岸限制处理设施(CDF)作为现代集装箱码头。第三,泰德威廉姆斯隧道建于20世纪90年代,在波士顿港,使用大规模凝固/稳定污染沉积物在高地CDF中。最近的项目是博斯普鲁斯人下的马尔马雷轨道隧道隧道,将利用CDF进行污染的沉积物 - 土耳其类型的第一设施。这四个项目在过去三十年中,由于连续收紧环境限制,过去三十年来说明了疏浚和处置成本的显着增加。此外,升级的处置成本威胁到其他有吸引力的隧道施工方法的经济可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号