首页> 外文会议>Multidisciplinary Conference >PA State Route 33 over Bushkill Creek: Structure Failure and Replacement in an Active Sinkhole Environment
【24h】

PA State Route 33 over Bushkill Creek: Structure Failure and Replacement in an Active Sinkhole Environment

机译:Pa State 33 over Bushkill Creek:结构故障和处于活动污水池环境中的替代品

获取原文

摘要

In January 2004 a sinkhole formed under a pier of the three span bridge carrying northbound SR 33 traffic over BushkiU Creek. The bridge was located in a highly active sinkhole area. A limestone quarry is located just upstream of SR 33. Attempts to fill the sinkhole and halt settlement of the pier were unsuccessful, and necessitated closing and eventual replacement of both the northbound and southbound structures. The geology includes the Epler and Jacksonburg Formations, which are intensely folded and faulted with numerous joints and fractures. Weathering of these deformed units produce deeply developed karst topography. Subsurface exploration for the new structure included a combination of borings and geophysical methods. Geophysical methods included resistivity and seismic techniques. Rock encountered consisted of limestone and dolomite. Rock was highly voided with soil filled seams, and generally low recovery. The replacement bridges consisted of single span prestressed concrete I-beam structures supported on micro-pile foundations. The single span option had the advantage of construction time and cost savings, and the benefit of no substructure units down in or near the creek. Staying out of the creek had positive implications for environmental and stream health concerns, and major safety improvements of minimizing worker exposure to the most unstable areas of the project site, relative to sinkhole activity. Sinkhole development remained high in and around the site, during construction operations.
机译:2004年1月,在携带北行SR 33交通的三个跨度桥的码头下形成了一个污水孔。该桥位于一个高度活跃的污水区。石灰石采石场位于SR 33的上游。试图填补污水池和停止码头的沉降是不成功的,并且需要关闭和最终更换北行和南行结构。地质包括EPLER和杰克逊堡的形成,它与许多关节和骨折密切折叠和断层。这些变形的单位的风化会产生深刻的开发岩溶地形。新结构的地下探索包括硼管和地球物理方法的组合。地球物理方法包括电阻率和地震技术。遇到的岩石由石灰石和白云石组成。岩石与土壤填充接缝高度无效,并且通常低收回。更换桥梁由单跨预应力混凝土I光梁结构组成,支持微桩基础。单个跨度选项具有施工时间和成本节约的优势,以及小溪内或附近的下部结构单元的益处。远离小溪对环境和流的健康问题产生了积极的影响,以及最小化工人暴露在项目现场最不稳定的地区的主要安全改进,相对于陷阱活动。在施工业务期间,陷阱开发仍然高于和周围地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号