BP'S BIG GREEN TRAIN: BENCHMARKING NEXT GENERATION LNG PLANT DESIGNS LE GRAND TRAIN VERT DE BP : DEFINITION DE LA NOUVELLE NORME DE CONCEPTION DES USINES DE GNL DE LA PROCHAINE GENERATION

机译:BP的大绿火车:下一代LNG工厂设计BP的伟大绿色火车:下一代新的GNL设计标准的定义

获取原文

摘要

Through the Big Green Train Project, BP with KBR as the engineering contractor undertook an extensive program that evaluated key aspects of design and engineering of a Baseload LNG Liquefaction plant. The study results provided a high level of confidence that "Next Generation" LNG plant designs are achievable and that the industry standards will be raised for future LNG plants based on design, capacity, life cycle cost and green house gas emissions. BP set aggressive targets and the project team met these challenges through close collaboration between the owner, contractor and process licensor. The Big Green Train plant designs were based on LIQUEFINTM liquefaction technology process that was developed by Axens/IFP, Institut Fran?ais du PEtrole. The project team set a program to determine if the other available liquefaction process technologies could deliver similar results. The team developed a benchmarking basis of design that contained sufficient level of detail on the design parameters without penalizing any of the LNG process technologies. Although this was a significant effort, it was required to ensure a fair and unbiased comparison of the technologies. This effort would not have been possible without the tremendous support of the LNG technology Licensors who participated. This paper shows that any of the participating process Licensors' technologies can be used for "Next Generation" LNG plants. While process technology has some influence on the cost of a LNG plant, success is really achieved by the owner/contractor project team working in conjunction with the process licensor toward common goals.
机译:通过大型绿色火车项目,BP与KBR作为工程承包商进行了广泛的计划,评估了基础LNG液化厂的设计和工程的关键方面。该研究结果提供了高度的信心,即“下一代”液化天然气工厂设计是可实现的,并且基于设计,容量,生命周期成本和绿色房屋气体排放,将向未来的LNG工厂提高行业标准。 BP集体攻击目标,项目团队通过在所有者,承包商和流程许可方之间密切合​​作达到这些挑战。大型绿色火车厂设计基于液晶液液化技术过程,由Axens / IFP,Institut Fran开发的?AIS Du Petrole。项目团队设置了一个程序,以确定其他可用的液化过程技术是否可以提供类似的结果。该团队开发了一种基准的设计基础,在设计参数上包含足够的细节水平,而不会惩罚任何LNG过程技术。虽然这是一项重大努力,但需要确保公平和无偏见的技术比较。如果没有参与的LNG技术许可方的巨大支持,这项努力将无法实现。本文表明,任何参与过程许可方的技术都可以用于“下一代”LNG工厂。虽然流程技术对液化天然气工厂的成本产生了一些影响,但业主/承包商项目团队与进程许可团一起与共同目标一起工作的成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号