首页> 外文会议>International Conference on Engineering Computational Technology >A Multi-objective Genetic Algorithm Model for Time-Cost Trade-Off Analysis of Construction Projects
【24h】

A Multi-objective Genetic Algorithm Model for Time-Cost Trade-Off Analysis of Construction Projects

机译:一种多目标遗传算法施工项目时间成本折衷分析

获取原文

摘要

Time-cost trade-off analysis is one of the most important aspects of construction project planning and control. There are trade-offs between time and cost to complete the activities of a project. Existing methods for time-cost trade-off analysis are not efficient enough to solve large-scale CPM networks (hundreds of activities or more). This paper presents an advanced and robust multi-objective genetic algorithm model for the time-cost trade-off analysis of construction projects. The model allows construction planners to generate and evaluate optimal/near-optimal trade-offs between project durations and total costs. The computations in the present model are organized in three major modules. A scheduling module that develops practical schedules for construction projects. A cost module that computes the project direct, indirect, and total costs. A multi-objective module that searches for and identifies optimal/near optimal tradeoffs between project duration and total cost. An illustrative example is presented to illustrate the use of the model and to demonstrate its capabilities in the time-cost trade-off analysis of construction projects.
机译:时间成本权衡分析是建设项目规划和控制的最重要方面之一。在时间和成本之间进行权衡,以完成项目的活动。时间成本折衷分析的现有方法不足以解决大规模的CPM网络(数百个活动或更多)。本文介绍了建筑项目时间成本折衷分析的先进且鲁棒的多目标遗传算法模型。该模型允许建设规划者在项目持续时间和总成本之间产生和评估最佳/近最优权衡。本模型中的计算由三个主要模块组织。一个调度模块,为建筑项目开发实际时间表。一种成本模块,可指定项目直接,间接和总成本。一个多目标模块,用于搜索并识别项目持续时间和总成本之间的最佳/接近最佳权衡。提出了说明性示例以说明模型的使用并在建筑项目的时间成本折衷分析中展示其能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号