Field Testing and Long-term Monitoring of West Mill Bridge

机译:西磨桥的现场测试和长期监测

获取原文

摘要

West Mill Bridge, the first FRP composite bridge on the European public highway network, spans over the River Cole in Oxfordshire, UK, and was opened on 29~(th) October 2002. The bridge has a span of 10 metres, a width of 6.8 metres and carries two traffic lanes and footpaths. To determine the in-service structural performance of the bridge, conventional and novel monitoring systems were installed during the fabrication of the bridge superstructure. The data from the initial load test on the bridge is presented and various aspects compared with the predicted design performance. The static deflection of the bridge under the test load was within 15 percent of the predicted value using theoretical and numerical analyses. The degree of composite action between the decking and main longitudinal beams, in particular, and other secondary structural elements has a significant effect on the global flexural rigidity of the structure, which is discussed in light of the strain data obtained during the load test. The fabrication of the bridge superstructure was completed in 7 days, and the construction methods used for the FRP composite superstructure of West Mill Bridge are described, highlighting the advantages and disadvantages. Conclusions and observations are presented on the short-term structural performance and the efficiency of the methods used for the construction of West Mill Bridge.
机译:西磨桥是欧洲公共公路网的第一个FRP复合桥,在英国牛津郡的CORE河上,并于2002年10月29日开业。该桥的跨度为10米,宽度6.8米,带有两个交通车道和人行道。为了确定桥的适用于桥接结构性能,在制造桥式上部结构期间安装了常规和新颖的监控系统。呈现来自桥梁上的初始负载测试的数据以及与预测的设计性能相比的各个方面。使用理论和数值分析,在测试负载下桥梁的静态偏转在预测值的15%以内。折叠和主纵梁之间的复合动作程度,特别是与其他二级结构元件对结构的全局弯曲刚度有显着影响,这是根据负载测试期间获得的应变数据讨论的结构。在7天内完成桥式上部结构的制造,描述了用于西部磨机桥FRP复合结构的施工方法,突出了优点和缺点。结论和观察提出了短期结构性能和用于建造西磨机桥梁的方法的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号