首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >Practice of Coalbed Methane Drainage by Drilling Multilateral Horizontal Well in Coal Mine
【24h】

Practice of Coalbed Methane Drainage by Drilling Multilateral Horizontal Well in Coal Mine

机译:煤矿多边水平井煤层煤层排水的实践

获取原文

摘要

The project is reside in Southern Qinshui Basin of Shanxi Province in China, where the Daning mine property is located. Southern Qinshui Basin has been rated by experts from both domestic and abroad as the best-potentialed CBM reservoir in China.Commercial potential of CBM in Southern Qinshui basin has never been extended to its full capacity in the past 10 years of explorations and production tests. The low and erratic production of the vertical hydrau-fracing wells drilled there has almost extinguished any of the enthusiasm initiated by the good reservoir conditions.
机译:该项目居住在中国山西省晋水盆地南部,其中丹宁矿物业位于山西省。秦水盆地南部由国内外的专家评价,因为中国南部南部南部煤层气中煤层气的最佳潜力潜力从未延长到过去10年的探索和生产测试的全部产能。垂直湿润的井的低价和不稳定的生产钻孔几乎熄灭了良好的水库条件发起的任何热情。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号