首页> 外文会议>International Conference on Environmental Remediation and Radioactive Waste Management >STAKEHOLDER PARTICIPATION FOR THE LEGACY PONDS AND LEGACY SILOS (LPLS) FACILITY AT SELLAFIELD, CUMBRIA. UK: THE NATURE AND EFFECTIVENESS OF THE DIALOGUE
【24h】

STAKEHOLDER PARTICIPATION FOR THE LEGACY PONDS AND LEGACY SILOS (LPLS) FACILITY AT SELLAFIELD, CUMBRIA. UK: THE NATURE AND EFFECTIVENESS OF THE DIALOGUE

机译:利益攸关方参与Sellafield,Cumbria的遗产池塘和遗留筒仓(LP&LS)设施。英国:对话的性质和有效性

获取原文

摘要

The Legacy Ponds and Silos (LP&S) facilities are part of the UK nuclear legacy located at the Sellafield Site, Cumbria. There are four individual facilities containing nuclear wastes that have accumulated over a period of approximately 50 years. Waste retrieval and conditioning, in preparation for decommissioning, is currently being carried out by the site operator. LP&S have recently proposed a re-engagement with stakeholders following the initial engagement in December 2005. This paper reviews this earlier engagement in terms of the nature of dialogue that was carried out when compared against definitions of deliberation provided in the literature. The aim of this paper is to provide those planning future engagement with a better understanding of how the nature of dialogue can vary and uses participation and deliberation as indicators of effective engagement. A concern of those working towards a programme of effective stakeholder participation in 2005 was how to ensure genuine dialogue and stakeholder representation in such a strictly controlled and regulated environment with a technical complexity that challenges technical specialist and layperson alike. LP&S recognised that effective dialogue with stakeholders on the available technical options and their associated societal impacts would form a significant part of this process if options were to prove resilient. However, the challenge presented to LP&S was how to engage stakeholders on a variety of projects, whilst ensuring the output could be used by the projects as part of their technical decision making. Initial contact was made with stakeholders in December 2005, as part of a 'Baseline' Best Practicable Environmental Option (BPEO) study. A BPEO study leads to decisions on waste management based on an integrated assessment of alternative options, on the basis of factors such as the occupational and environmental risks, the environmental impacts, costs and social implications of the options. An engagement framework was also developed by LP&S to understand the engagement within the context of that taking place nationally and internationally. LP&S plan to reconvene stakeholders as part of the commitment made to them in 2006 to review progress on decommissioning projects. Currently, the strategy by which this will be achieved is unclear, however it is proposed that rather than full engagement, LP&S will provide a series of information updates to the West Cumbria Site Stakeholder Group (WCSSG). Representing local interests only and potentially reducing the opportunity for deliberation, further research is recommended to assess the nature of dialogue and the role of deliberation in this type of forum.
机译:遗产池塘和筒仓(LP&S)设施是位于坎布里亚郡Sellafield网站的英国核遗产的一部分。有四种含有四个核废物的设施,积累了大约50年的时间。废物检索和调节,以准备退役,目前正在由站点运营商进行。 LP&S最近提出了在2005年12月初步参与之后与利益攸关方重新接触。本文审查了对对话的性质的初步参与,该对话的性质是在与文献中提供的审议定义进行比较时进行的。本文的目的是提供这些计划未来参与,更好地了解对话的性质如何变化,并使用参与和审议作为有效参与的指标。关于2005年有效利益攸关方参与计划的人的关注是如何在这种严格控制和监管的环境中确保真正的对话和利益攸关方代表,其技术复杂性挑战技术专家和拉德氏蛋白。 LP&S认识到,如果选择是证明弹性,则将有效的与利益相关者与利益相关者进行有效对话。但是,呈现给LP&S的挑战是如何在各种项目中聘请利益相关者,同时可以通过该项目作为其技术决策的一部分来使用该项目。 2005年12月与利益攸关方进行了初步联系,作为“基线”最佳实用环境选项(BPEO)研究的一部分。基于职业和环境风险,环境影响,成本和社会影响等因素,BPEO研究基于综合评估,基于综合评估,基于替代方案的综合评估,对职业和环境风险,环境影响,成本和社会影响等因素进行综合评估。 LP&S还开发了一个订婚框架,以了解全国和国际上发生的背景下的参与。 LP&S计划将利益相关者重新讨论为2006年对其作出的承诺,以审查退役项目进展情况。目前,将实现这一策略尚不清楚,但提出了,LP&S将为West Cumbria网站利益相关者组(WCSSG)提供一系列信息更新。代表当地利益仅限,潜在地减少审议机会,建议进一步研究,以评估对话的性质和审议在这种论坛中的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号