首页> 外文会议>International conference on low-volume roads >Implementation of the British Columbia Side Road Assessment Plan
【24h】

Implementation of the British Columbia Side Road Assessment Plan

机译:不列颠哥伦比亚省侧路评估计划的实施

获取原文

摘要

With more than 61,000 lane-km, the British Columbia side road network is an important economic asset to the province, providing access to a large resource-based economy. This network is composed of paved (25,000 lane-km) and unpaved (36,000 lane-km) sections of various geometric and construction standards and low traffic volumes. In the mid-1990s, the British Columbia Ministry of Transportation completed implementation of a comprehensive corporate pavement management application on its entire primary and secondary highway system. The ministry was also committed to extension of the system to all roads under its jurisdiction as part of its asset management practices to support formalized condition assessment and needs analysis processes. One of the obstacles facing the implementation of pavement management application on the side roads was the huge data collection cost, particularly in a time of governmentwide fiscal restraint. The side road data collection project was initiated with the objective of developing a data collection methodology and plan for the entire network by a combination of continuous and sampled approaches. The approach used to modify the existing U.S. Corps of Engineers data collection system for unpaved roads to conditions in British Columbia and the Held verification trials that were completed before full-scale implementation are discussed. The data collection blueprint, which combines full and sampled coverage of the network with a road classification system, is also described. The results of the first data collection cycle and lessons learned are presented.
机译:不列颠哥伦比亚省侧路网络拥有超过61,000千克,是该省的重要经济资产,提供了对基于大量资源的经济性。该网络由铺砌(25,000 km)和未铺砌(36,000辆Lane-km)部分的各种几何和建筑标准和低交通卷组成。在20世纪90年代中期,不列颠哥伦比亚省的交通部完成了在整个中小型高速公路系统上综合的企业路面管理申请。该部还致力于将该系统延长到其管辖范围内的所有道路,作为其资产管理实践的一部分,以支持正式的条件评估和需求分析过程。在侧面道路上面临路面管理应用的障碍之一是巨大的数据收集成本,特别是在政府的财政克制时期。侧面道路数据收集项目是通过连续和采样方法的组合开发数据收集方法和计划整个网络的目的。用于修改现有的美国工程兵团的方法,为不列颠哥伦比亚省的未铺砌道路以及在全规模实施之前完成的未铺砌道路的工程师数据收集系统。还描述了与道路分类系统相结合的数据收集蓝图,它与道路分类系统相结合的全部和采样覆盖。提出了第一数据收集周期和经验教训的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号