首页> 外文会议>International conference acid rock drainage >Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience
【24h】

Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience

机译:酸性机场排水,20年和2000万美元的经验

获取原文

摘要

Transport Canada (Federal Government) constructed the Halifax International Airport (HIA) near Halifax, Nova Scotia, Canada in the late-1950s. Site location criteria were primarily; direct access to the city and a raised flat topography. Unfortunately, the site chosen was located on shallow Meguma group pyritic slate bedrock. In 1982, during the construction of an airport taxiway, it became very apparent that acidic run-off from excavated bedrock at the site was having a negative impact on adjacent aquatic habitat. The ensuing 20 years involved many efforts to rectify the acidic drainage problem with mixed results. Some of the techniques which have been implemented at HIA to address the acid rock drainage (ARD) issue include: dry covers, wet covers, wetlands, electrochemical treatment, open limestone channels, limestone gravel polishing beds, agricultural limestone application, and two hydrated lime [Ca(OH)2] addition treatment plants, the first producing low density sludge and the new one that creates high-density sludge. Based on over 20 years of water quality monitoring data it is apparent that only certain acid drainage mitigation methods have been effective at HIA. In 2000 when the Halifax International Airport Authority (the Authority) took control of the operation and management of the airport, including the ARD issue, it was decided to construct a modern, highdensity sludge, hydrated lime treatment system. This new $CAN 7 million system is now in operation and is achieving compliance with water quality guidelines. Due to high operating cost, a review of methods to optimise the system is being carried out. The HIA ARD problem, though minor by comparison to most mine sites, has provided unique challenges and may provide valuable insights into this urgent environmental and financial issue.
机译:运输加拿大(联邦政府)在20世纪50年代末加拿大加拿大哈利法克斯的哈利法克斯国际机场(HIA)建造了哈利法克斯国际机场(HIA)。网站位置标准主要是;直接进入城市和凸起的扁平地形。不幸的是,选择的网站位于浅兆欧集团的Pyritic Slate Bedrock上。 1982年,在机场滑行道的建造过程中,显而易见的是,在现场的挖掘基岩中酸性径流对邻近的水生栖息地产生负面影响。随后的20年涉及许多努力来纠正混合结果的酸性排水问题。一些已经在HIA已经实施,以解决酸性岩排水技术(ARD)问题包括:干燥盖,湿罩湿地,电化学处理,开石灰石渠道,石灰石碎石抛光床,农业石灰石的应用程序,和两个熟石灰内[Ca(OH)2]添加处理的植物,所述第一生产低密度污泥和创建高密度污泥新的。基于超过20年的水质监测数据,显而易见的是,只有某些酸引流缓解方法在HIA有效。 2000年,当哈利法克斯国际机场管理局(当局)控制机场的运作和管理时,包括ARD问题,决定建造一种现代,高度污泥,水泥处理系统。这种新的$不到7万个系统现已开始运作,并实现符合水质准则。由于高运营成本,正在进行对优化系统的方法进行审查。 HIA ARD问题虽然与大多数矿山的比较进行了次要的问题,但是提供了独特的挑战,并可能对这种紧急环境和财务问题提供有价值的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号