North Rankin B gas processing platform. Located 135 km off the north-west coast of Western Australia. Operated by Woodside Energy Ltd.. During the early engineering phase a decision was made to change the pump set from a 3 × 60% to a 2 × 100% to save on space and weight on the platform: 1. For unknown reasons a diesel engine with an undersized starter system was purchased for the pump string. 2. When the equipment inertias were calculated it was determined that the diesel engine starter might not be able to start the whole string. 3. Therefore it was decided to use a centrifugal clutch so the engine could be started without being connected to the pump. Torsional analysis during procurement of firewater pump package did not identify the shaft as being susceptible to failure.
机译:北距离B天然气加工平台。距离西澳大利亚西北海岸135公里。由Woodside Energy Ltd ..在早期的工程阶段期间,通过3×60%的泵将泵改为2×100%,以节省空间和平台的重量:1。出于未知原因柴油为泵串购买了带有尺寸尺寸的起动系统的发动机。 2.计算设备惯性惯性时,确定柴油发动机启动器可能无法启动整个串。因此,决定使用离心式离合器,因此可以在不连接到泵的情况下开始发动机。在防火泵封装采购期间的扭转分析没有识别轴,易受失败的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号