Investigation, Remediation and Cost Allocation of Contaminants from the Britannia Mine in British Columbia: A Case Study

机译:不列颠哥伦比亚省(不列颠哥伦比亚省)不列颠省矿区污染物的调查,修复和成本分配:一个案例研究

获取原文

摘要

Federal and provincial regulations exercise an important role in the remediation of the former Britannia mine site. Although the Fisheries Act remains one of the most important pieces of Canadian environmental legislation and is applicable to this site, the Remediation Orders have been issued under provincial legislation, the Waste Management Act. Both levels of government are committed to the complete remediation and cost allocation to clean up the site. To this effect, the BCMWLAP recently issued three requests for proposals, one for contaminated sites, another for a feasibility study of a wastewater treatment plant, and the third, characterization of the site hydrogeology. The forensic evidence suggests that the main source of contamination at Britannia mine is acid mine drainage from copper leaching originated during the operating life of the mine. Some acid mine drainage may have occurred naturally prior to the development of the mine due to the geological formation of the mountains where the mine was located. The sources of acid mine drainage appear to be located in the open basins and tunnels, which originally were open pits that became basins as mining of the mountain progressed. Mining took place on and within ore bodies located between Furry Creek and Britannia Creek. Relatively little impact would have been noticeable from the ore body prior to mining to Britannia Creek, Furry Creek and Howe Sound. Investigation into the sediments of Howe Sound may show the relative increase in copper contamination with the onsite mining one hundred years ago. The timing and release of acid mine drainage commenced shortly after the mine opened and began extracting ore from the site. Dissolved metals released into Howe Sound represent a long-term environmental problem if left unmitigated, rather than the metal content of the submerged tailings. A water treatment plant is proposed to address the effluent flow, consider the mine hydrology, diversion assessments and internal mine workings to minimize the acid mine drainage from entering into the various surface water bodies surrounding the former copper mine. Measures to cover exposed sulphide mineralization to reduce contact with water and air. Measures to include the diversion of uncontaminated water away from the sulphide mineralization including open pits and underground mine workings.
机译:联邦和省法规在前英国矿场的修复中行使重要作用。虽然渔业法案仍然是加拿大环保立法中最重要的碎片之一,但适用于本网站,省政法规已根据省级立法发出的修复令。政府各级均致力于完全修复和成本分配,以清理该网站。为此,BCMWLAP最近发布了三个提案请求,一个用于污染的地点,另一个用于废水处理厂的可行性研究,以及遗址水文地质的第三种表征。法医证据表明,不列颠洲矿的主要污染来源是在矿山的经营寿命期间从铜浸出的酸性矿山排水。由于矿井所在的山脉的地质形成,在矿井的发展之前,一些酸性矿矿喷射可能已经发生。酸矿排水的来源似乎位于开放的盆地和隧道中,隧道最初是开放的坑,成为山的山脉进展。矿业坐落在毛茸茸的溪和布兰尼亚溪之间的矿石身上。在挖掘Bryannia Creek,Furry Creek和Howe Sound之前,对矿体的影响相对较小。对Howe Sound沉积物的调查可能表现出百年前的现场采矿的铜污染的相对增加。矿井开放后不久开始酸性矿山排水的时序和释放,并开始从现场提取矿石。如果未发生未触发,而不是淹没尾矿的金属含量,释放到Howe声音的溶解金属表示长期的环境问题。提出水处理厂来解决废水流,考虑矿井水文,转移评估和内部矿山工作,以最大限度地减少酸性矿泉排水进入前铜矿周围的各种地表水体。覆盖暴露硫化物矿化的措施,以减少与水和空气接触的措施。包括从硫化物矿化的未受污染水转移的措施,包括开放式坑和地下矿井工作。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号