【24h】

A major refurbishment project after 20 years operation at Hunterston B

机译:在Hunterston B 20年后经过一项重大翻新项目

获取原文

摘要

The upgrading of older steam turbine plant with modern technology has become an increasingly attractive way for utilities to increase efficiency and capacity. This paper describes one such upgrade, showing how advances in steam turbine technology have been successfully applied to both components and modules in a 660 MW steam turbine unit at Hunterston Power Station. The challenge of installing the modifications in a short outage time, and the solutions adopted to achieve it, are discussed.
机译:具有现代技术的较旧汽轮机厂的升级已成为公用事业效率和能力越来越有吸引力的方式。本文介绍了一种这样的升级,介绍了在Hunterston发电站的660 MW汽轮机单元中成功应用于汽轮机技术的进步。讨论了在短暂停电时间内安装修改的挑战以及采用的解决方案来实现它。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号