Sewer Alignment Complexities in Historic Old Town Temecula

机译:历史悠久的老城区拘深员的下水道对准复杂性

获取原文

摘要

Eastern Municipal Water District (District) needed to increase the wastewater conveyance capabilities of the previously built-out historic commercial area of Old Town Temecula, California. This special water district evaluated several different alignments and construction methods, but with the heavily commercial area being only three blocks wide and dozens long bounded by a freeway on one side and a river on the other, very few options were viable. Several different trenching methods were considered for increasing capacity of the existing collection system. Initially a 36-in. microtunneled casing and carrier pipe was considered, but ultimately replaced with a less expensive option: Auger Boring Method. Once construction started, however, every drive attempt failed. Construction was completed by greatly exceeding the accepted drive lengths of traditional jack-and-bore. This paper describes the tunneling method evaluations and the ultimately successful construction approach.
机译:东部市政水区(区)需要增加夏季古城古老的历史商业区的废水运输能力。这个特殊的水域评估了几种不同的对准和施工方法,但随着庞大的商业区,只有三个块宽,几十个长长的长路,另一侧和另一河河上,很少有选择是可行的。考虑了几种不同的挖沟方法以增加现有收集系统的容量。最初是36英寸。考虑了Microtunneled壳体和载体管,但最终取代了更便宜的选择:螺旋钻镗法。但是,一旦建造开始,每个驱动器都会失败。通过大大超过传统杰克和孔的可接受的驱动长度来完成施工。本文介绍了隧道方法评估和最终成功的施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号