KESC is an electrical utility company involved in Generation, Transmission and Distribution of Electric Energy in Karachi, Pakistan. The total number of consumers of KESC to date is around 2.0 million. KESC started installing OPGW for providing data to the SCADA system in 1998 and till year 2006 around 151 km OPGW is installed. These OPGW cables connect the SCADA system to 8 power generating stations including the KESC generation stations and 56 grid stations of IPPs. In the course of testing and monitoring the installed OPGW, it was revealed that the OPGW installed at various transmission lines have been damaged. On close inspection of the samples taken from the damaged OPGW, it is found that the outer OPGW layer was almost melted and strings were broken. The optical fiber cable inside OPGW was also tested with the OTDR and it was also found broken. Therefore, it is concluded that the outer OPGW layer could not stand the voltage introduced due to the lighting strokes. In addition, the distance between the hanging OPGW was not enough to withstand the million of volts and a flash occur between OPGW. In this paper, the selection criteria of OPGW cables based on engineering specification are discussed. This paper also discusses the methods and standardized test procedures for OPGW cables. Finally, the replacement strategy of the conventional ground wire by OPGW is presented.
机译:KESC是一家在巴基斯坦卡拉奇从事发电,输电和配电的电力公司。迄今为止,KESC的消费者总数约为200万。 KESC从1998年开始安装OPGW,以向SCADA系统提供数据,直到2006年,大约已安装151 km OPGW。这些OPGW电缆将SCADA系统连接到8个发电站,包括KESC发电站和56个IPP电网站。在测试和监视已安装的OPGW的过程中,发现安装在各个传输线上的OPGW已损坏。仔细检查从损坏的OPGW取出的样品后,发现OPGW的外层几乎融化,绳子断裂。 OPGW内部的光缆也已通过OTDR进行了测试,也发现它已损坏。因此,可以得出结论,外部OPGW层不能承受由于照明冲程而引入的电压。另外,悬垂的OPGW之间的距离不足以承受百万伏特,并且OPGW之间出现闪光。本文讨论了基于工程规范的OPGW电缆的选择标准。本文还讨论了OPGW电缆的方法和标准化测试程序。最后,提出了用OPGW代替常规地线的策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号