首页> 外文会议>International Conference on Electrical, Communication, and Computer Engineering >Optimal operation of the Jirau hydroelectric power plant reservoir using nonlinear optimization
【24h】

Optimal operation of the Jirau hydroelectric power plant reservoir using nonlinear optimization

机译:基于非线性优化的吉劳水电站水库优化调度

获取原文

摘要

Hydroelectric production is normally scheduled with respect to the demand in the power network at any time. At the hydroelectric power plant, regulating the volume of the reservoir is an important strategy to optimize the energy production. In this context, this paper proposes a control strategy for the optimal operation of the reservoir of Jirau hydroelectric power plant. This strategy is obtained using nonlinear optimization in order to maximize the production of electricity according to daily reservoir variation. To validate the model it was used historical data of the plant's flow. Results show that the model concentrated resources in the region with the highest energy demand, increasing reservoir use. On the other hand, it has preserved resources in regions of lower demand, increasing reservoir volume.
机译:通常在任何时候都根据电网中的需求计划水力发电。在水力发电厂,调节水库的蓄水量是优化能源生产的重要策略。在此背景下,本文提出了吉劳水电站水库优化运行的控制策略。该策略是使用非线性优化来获得的,以便根据每日水库变化最大化发电量。为了验证该模型,使用了工厂流量的历史数据。结果表明,该模型将资源集中在能源需求最高的区域,从而增加了水库的利用。另一方面,它在需求量较低的地区保留了资源,从而增加了储量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号