Grand River Dam Authority (GRDA) operates a coal-fired electrical production power plant located thirty miles from Tulsa, Oklahoma. The facility contains two primary turbine-generators, referred to as Unit 1 and Unit 2. Each unit consists of a coal combustion boiler, a steam turbine, an electric generator, pollution control equipment, and auxiliary support equipment. Total maximum facility generating capacity for this plant is 1010 megawatts. ALSTOM Power was awarded a contract by GRDA to upgrade the obsolete control system for its Unit 2 turbine-generator during the fall 2007 outage. The scope included new steam turbine valves actuators, a 3-channel hydraulic safety system, electronic turbine control and protection systems, and a generator automatic voltage regulator, along with associated services and on-site training. Demolition, installation, commissioning and all performance tests had to be completed during a short 3-weeks schedule. The project is now complete; an obsolete control system was replaced with a more efficient, state-of-the-art control system. This paper will discuss and document details concerning this modernization control system.
机译:Grand River Dam Dirisition(Grda)经营着距离俄克拉荷马州塔尔萨三十英里的燃煤电气生产电厂。该设施包含两个主要涡轮发电机,称为单元1和单元2。每个单元由煤燃烧器,蒸汽轮机,发电机,污染控制设备和辅助支撑设备组成。该植物的总产能总量为1010兆瓦。 Alstom Power由GRDA授予合同,在2007年下降期间,GRDA升级其单位2个涡轮发电机的过时控制系统。该范围包括新的蒸汽轮机阀门致动器,3通道液压安全系统,电子涡轮机控制和保护系统,以及发电机自动稳压器,以及相关服务和现场培训。在短期3周的时间表中,必须完成拆除,安装,调试和所有性能测试。该项目现在完成;用更有效的最先进的控制系统代替过时的控制系统。本文将讨论和记录有关此现代化控制系统的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号