首页> 外文会议>Institute of Transportation Engineers Annual Meeting and Exhibit >Efficient Work Zone Traffic Control/Maintenance and Protection of Traffic in Urban Work Zones - Balancing Competing Stakeholders' Needs
【24h】

Efficient Work Zone Traffic Control/Maintenance and Protection of Traffic in Urban Work Zones - Balancing Competing Stakeholders' Needs

机译:高效的工作区交通控制/维护和保护城市工作区的交通-平衡利益相关者的需求

获取原文

摘要

The New York State Department of Transportation has undertaken the construction of the new Kosciuszko Bridge (K-Bridge), the largest Design-Build project in the history of NYSDOT. The bridge carries the Brooklyn-Queens Expressway (1-278) over Newtown Creek and connects the two New York City boroughs of Brooklyn and Queens. The existing bridge carries three lanes of traffic in each direction and experiences congestion for most hours of the day. Once complete, the new bridge will be a cable-stayed Bridge with wider lanes, standard shoulders, and additional lanes in both directions. It will also feature a significantly reduced road grade which will improve traffic safety, reduce congestion, and improve travel speeds on this segment of Ⅰ-278.
机译:纽约州交通部已经承建了新的Kosciuszko桥(K桥),这是NYSDOT历史上最大的设计建造项目。该桥在新镇溪上承载布鲁克林-皇后区高速公路(1-278),连接布鲁克林和皇后区两个纽约市行政区。现有的桥梁在每个方向上都有3条车道通行,并且一天中大部分时间都处于拥堵状态。一旦完成,新的桥梁将是斜拉桥,具有更宽的车道,标准的路肩和双向的额外车道。它还将显着降低道路坡度,这将改善Ⅰ-278这段路段的交通安全,减少交通拥堵,并提高行驶速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号