The Orleans Avenue Outfall Canal is one of several canals that collect and transmit surface drainage from the northern portions of New Orleans. The earthen levees/floodwalls that flank the east and west banks of the canal were designed to provide parallel protection from tidal intrusion from Lake Pontchartrain. In response to the observed failures along portions of the flood protection system during hurricane Katrina, new design methodologies and criteria were adopted by the U. S. Army Corps of Engineers (USACE), and the entire New Orleans hurricane protection system was evaluated in terms of these new criteria. Portions of the flood protection system along Orleans Avenue Canal were found to be deficient. Ground improvement by the deep mixing method was selected to improve stability in two reaches due to right-of-way constraints and environmental concerns. This paper provides detailed descriptions of the design, specifications, and construction of the deep mixing at Orleans Avenue Canal, including results of the coring and strength testing in comparison to the specification requirements. The design process included site characterization, determination of the design strength of the deep-mixed ground with consideration of variability, limit equilibrium analyses of multiple failure modes, numerical analyses including a water-filled gap behind the floodwalls, and development of plans and specifications. Given the difficult access constraints and the close proximity to existing structures, the Contractor chose to install the deep mixing using the dry method. The use of real time data acquisition systems on the installation equipment allowed the Contractor to expedite QC/QA and site calibration of the mixing process. The project specifications required core drilling in the deep-mixed ground, logging of the recovered core, and strength testing on selected specimens. The process control documentation and the test results demonstrated satisfaction of the project specification requirements.
机译:奥尔良大道排污渠是从新奥尔良北部收集并传递地表排水的几条运河之一。运河东岸和西岸两侧的土堤/防洪墙旨在为庞恰特雷恩湖的潮汐入侵提供平行保护。为了应对卡特里娜飓风期间沿途防洪系统的部分故障,美国陆军工程兵团(USACE)采用了新的设计方法和标准,并对新奥尔良的整个飓风保护系统进行了评估。标准。人们发现,奥尔良大街运河沿线的防洪系统部分不足。由于路权限制和环境问题,选择使用深层混合法进行地面改良以提高两个河段的稳定性。本文提供了有关奥尔良大道运河深层搅拌的设计,规格和施工的详细说明,包括与规格要求相比的取芯和强度测试结果。设计过程包括场地表征,考虑变化性确定深层混合料的设计强度,对多种破坏模式进行极限平衡分析,数值分析(包括在防洪墙后面的充水缝隙)以及制定计划和规范。考虑到困难的进出限制和与现有结构的距离,承包商选择使用干式法进行深层搅拌。在安装设备上使用实时数据采集系统使承包商可以加快质量控制/质量保证和混合过程的现场校准。项目规范要求在深层混合地面中进行岩心钻探,对回收的岩心进行测井,并在选定的样本上进行强度测试。过程控制文档和测试结果表明满足项目规范要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号