首页> 外文会议>Annual conference of the Canadian Society for Civil Engineering >INTEGRATING BRIDGE INFORMATION MODELING (BrIM) WITH COST ESTIMATION AT THE CONCEPTUAL DESIGN PHASE OF BRIDGES
【24h】

INTEGRATING BRIDGE INFORMATION MODELING (BrIM) WITH COST ESTIMATION AT THE CONCEPTUAL DESIGN PHASE OF BRIDGES

机译:在桥梁概念设计阶段将桥梁信息建模(BrIM)与成本估算集成在一起

获取原文

摘要

Integration of bridge information modeling (BrIM) with bridge management systems and computer-aided engineering design solutions had inspired many researchers over the past few years. Several successful integrations of BrIM with these solutions had significantly leveraged downstream processes of bridge projects. Over the years, one of the major obstacles encountered by BrIM integration experts was the functional interoperability with other solutions. In this study, research objectives are intended to demonstrate the viability of integrating BrIM with cost estimation while resolving BrIM integration with computer-aided structural analysis solutions interoperability issues. In this paper, an integrated prototype that fosters operational efficiency and cost savings for multiple types of bridges is presented. The proposed research methodology includes a preliminary estimation system comprising cost optimization modules which is developed in a .NET framework. The developed prototype will be capable of receiving and automatically incorporating 3D real-time information reflecting site alterations and corresponding effects on project overall cost. A case project was defined to validate the model and illustrate its corresponding numerical capabilities. Results presented in this study will enhance estimation techniques for bridge contractors and stakeholders by the inclusion of all direct and indirect costs associated with the different phases of a bridge project ranging from design conceptual phases to substructure, including heavy earthmoving operations, and superstructure. The prototype model is anticipated to be of major significance to contractors and considered a "brand-new" contribution to BrIM integrated technologies with cost management approaches.
机译:在过去的几年中,桥梁信息建模(BrIM)与桥梁管理系统以及计算机辅助工程设计解决方案的集成激发了许多研究人员的灵感。 BrIM与这些解决方案的几次成功集成极大地利用了桥梁项目的下游流程。多年来,BrIM集成专家遇到的主要障碍之一是与其他解决方案的功能互操作性。在本研究中,研究目标旨在证明将BrIM与成本估算相集成的可行性,同时解决BrIM与计算机辅助结构分析解决方案的互操作性问题。在本文中,提出了一个集成的原型,可以提高多种类型桥梁的运营效率并节省成本。拟议的研究方法包括一个初步估算系统,该系统包括在.NET框架中开发的成本优化模块。开发的原型将能够接收并自动合并3D实时信息,以反映站点变更以及对项目总成本的相应影响。定义了一个案例项目来验证模型并说明其相应的数值能力。这项研究中提出的结果将包括与桥梁项目不同阶段相关的所有直接和间接成本,从设计概念阶段到子结构,包括重型土方工程和上部结构,将提高桥梁承包商和利益相关者的估算技术。预计该原型模型对承包商将具有重要意义,并被认为是采用成本管理方法对BrIM集成技术的“全新”贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号