Construction of a Metro Tunnel in Mexico City with an EPB Shield

机译:在墨西哥城修建带有EPB防护罩的地铁隧道

获取原文

摘要

The construction of the tunnel for Metro Line 12 represents a breakthrough and a challenge to Mexican engineering as this is the first great diameter mechanized tunnel to be bored under urban area and in the special soft soil conditions typical of Mexico City clays. It is a tunnel excavated by EPB TBM under very low covers and also subjected to regional subsidence phenomena. Along its way, the EPB shield runs below and next to important underground structures such as sewerage tunnels and river conductions, pile foundations for bridges, superficial Metro lines and underground crossways. The present paper discusses the excavation process of the first three sections of the tunnel, the first of which served as the learning curve of the process.
机译:地铁12号线隧道的建设是墨西哥工程的突破和挑战,因为这是在市区和墨西哥城黏土典型的特殊软土条件下开凿的第一条大直径机械化隧道。它是由EPB TBM在非常低的覆盖率下开挖的隧道,并且还经历了区域沉降现象。沿途,EPB盾构在重要的地下结构(如污水隧道和河道,桥梁的桩基,地铁浅层线路和地下人行横道)的下方和附近延伸。本文讨论了隧道前三部分的开挖过程,其中第一部分是该过程的学习曲线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号