首页> 外文会议>2011 International Conference on System Science, Engineering Design and Manufacturing Informatization >Fuzzy risk comprehensive evaluation and analysis of BOT hydropower projects in African region
【24h】

Fuzzy risk comprehensive evaluation and analysis of BOT hydropower projects in African region

机译:非洲地区BOT水电项目的模糊风险综合评价与分析

获取原文

摘要

Overseas investment in hydropower enterprises has been quickly increased with a rush, taking an important position in foreign direct investment for China. The Chinese investments in hydropower enterprises are mainly focused on Asian, African, and South American markets, especially typical of a relatively large market in Africa. The undertaking of overseas hydropower projects in the way of BOT in overseas hydropower investment have been more and more welcomed by hoar countries and particularly by developing countries. While the investment in BOT hydropower projects is generally large, certain risk exists at the same time. On this account, this article has analyzed the risk degrees for one of the African regional hydropower projects through fuzzy comprehensive analytic method. The analysis of instance shows the result concluded through this method is objective and reasonable, which can be widely applied to BOT hydropower projects in African.
机译:水电企业的海外投资迅速增加,在中国的外国直接投资中占有重要地位。中国对水电企业的投资主要集中在亚洲,非洲和南美市场,尤其是在非洲相对较大的市场中。以BOT方式进行海外水电投资的海外水电项目越来越受到ho国特别是发展中国家的欢迎。虽然BOT水电项目的投资通常很大,但同时存在一定的风险。有鉴于此,本文通过模糊综合分析方法对非洲某地区水电项目的风险度进行了分析。实例分析表明,该方法得出的结论是客观合理​​的,可广泛应用于非洲BOT水电项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号