首页> 外文会议>International low impact development conference >Design, Construction, and Maintenance of LID Practices: Results from a Field Assessment in Virginia's James River Watershed
【24h】

Design, Construction, and Maintenance of LID Practices: Results from a Field Assessment in Virginia's James River Watershed

机译:LID实践的设计,构建和维护:弗吉尼亚州詹姆斯河流域的现场评估结果

获取原文

摘要

In 2008, the Center for Watershed Protection, Inc. (CWP) and project partners conducted a field assessment of nearly two hundred stormwater management facilities, including selected LID practices, throughout urban areas of Virginia's James River watershed. This assessment was conducted as part of CWP's Extreme BMP Makeover project, a three-year endeavor to aggressively improve the nutrient reduction achieved by stormwater best management practices (BMPs) within Virginia's James River watershed and the greater Chesapeake Bay region. The project is funded in part by the National Fish and Wildlife Foundation.
机译:2008年,流域保护中心(CWP)和项目合作伙伴对整个弗吉尼亚州詹姆斯河流域市区的近200种雨水管理设施进行了现场评估,其中包括部分LID实践。这项评估是CWP的“极端BMP改造”项目的一部分,该项目为期三年,旨在通过弗吉尼亚州詹姆斯河流域和更大的切萨皮克湾地区,积极改善雨水最佳管理实践(BMP)所实现的养分减少。该项目部分由国家鱼类和野生动物基金会资助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号