【24h】

Paradox of the Bermuda Triangle Applying Systems Engineering in a PPP-environment

机译:PPP环境中百慕大三角应用系统工程的悖论

获取原文

摘要

Applying Systems Engineering to a Public Private Partnership (PPP) contract requires a closed-loop control between the project goals, the project management and the content itself. Unexpected events, contradicting incentives and many more reasons can easily open the closed-loop without initially being perceived. All parties involved should participate actively at peer levels in order to assure the closed-loop control. The transparent and phased approach of Systems Engineering supports achieving this peer level closed-loop control.
机译:将系统工程应用到公私合营(PPP)合同要求在项目目标,项目管理和内容本身之间进行闭环控制。意外事件,激励措施相互矛盾以及更多原因,很容易在没有最初察觉的情况下打开闭环。有关各方应在对等层积极参与,以确保闭环控制。系统工程的透明且分阶段的方法支持实现此对等级别的闭环控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号