首页> 外文会议>International bridge conference >Retrofitting the Burlington-Bristol Bridge
【24h】

Retrofitting the Burlington-Bristol Bridge

机译:翻新伯灵顿-布里斯托尔大桥

获取原文

摘要

Insights into the design and decision-making processes for retrofitting the Burlington-Bristol Bridge, an aging, signature, moveable bridge between Pennsylvania and New Jersey, featuring a vertical-lift truss. Due to a repainting project, select bridge members required increased capacity to accommodate significant increases in the potential applied wind load as a tarp containment system was proposed on the Tower and Lift Spans. Includes discussion on challenges faced during construction and benefits of applied asset management tools.
机译:对改造伯灵顿-布里斯托尔大桥的设计和决策过程的见解,伯灵顿-布里斯托尔大桥是宾夕法尼亚州和新泽西州之间一座老化的,标志性的,可移动的桥梁,具有竖向起重的桁架。由于进行了重新粉刷工程,某些塔桥构件需要增加容量,以适应​​塔架和举升跨度上的防水油布围堵系统,从而潜在地增加了潜在的施加的风荷载。包括有关施工期间面临的挑战以及应用资产管理工具的好处的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号