Sharm El-Sheikh 5 MW PV Plant Performance, Environmental Impact and Grid Connection Parameters

机译:沙姆沙伊赫5兆瓦光伏电站的性能,环境影响和并网参数

获取原文

摘要

A few years ago, most of photovoltaics (PV) were installed in rather small stand-alone systems, the majority of today´s modules are implemented in grid-connected systems satisfying well-defined technical aspects. This growth is mostly due to the ambitious subsidy programs adopted by governments in the developing countries. Meanwhile, to be successfully integrated with the utility grid in low, medium, or high voltage networks, it is essential to meet the requirements of the country interconnection code. In this paper, the requirements of the Egyptian grid code for connecting a 5 MW PV plant with utility grid have been examined and evaluated. In addition, the environmental effects of installing the PV plant have been discussed and compared with fossil fuels.
机译:几年前,大多数光伏(PV)安装在相当小的独立系统中,当今的大多数模块都在满足明确技术要求的并网系统中实现。这种增长主要归因于发展中国家政府采取的雄心勃勃的补贴计划。同时,要成功地与低压,中压或高压网络中的公用电网集成,必须满足国家/地区互连规范的要求。在本文中,已经检查并评估了埃及电网法规中连接5 MW光伏电站与公用电网的要求。此外,已经讨论了安装光伏电站的环境影响,并将其与化石燃料进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号