首页> 外文会议>International pipeline conference >STRESS CORROSION CRACKING (SCC) INTEGRITY MANAGEMENT PLANS FOR ONSHORE LIQUID AND GAS PIPELINES: SAUDI ARAMCO COMPREHENSIVE STUDY
【24h】

STRESS CORROSION CRACKING (SCC) INTEGRITY MANAGEMENT PLANS FOR ONSHORE LIQUID AND GAS PIPELINES: SAUDI ARAMCO COMPREHENSIVE STUDY

机译:陆上液体和气体管道的应力腐蚀裂纹(SCC)完整性管理计划:沙特阿美公司的综合研究

获取原文

摘要

Stress corrosion cracking (SCC) on buried pipelines results from simultaneous presence of tensile stress, a corrosive environment, and a material that is susceptible to SCC. ASME B31.8S provides a basic framework for determining the SCC susceptible segments of buried pipelines. In-line inspection (ILI) has been effective in the industry for locating and sizing SCC on pipelines. There are some inherent limitations in ILI tools that should be recognized in the development of a comprehensive SCC Integrity Management Plan. Saudi Aramco operates a combined pipeline network of approximately 22,000 kilometers in length. A significant number of Saudi Aramco pipelines were built prior to 1980 with tape coating, thereby increasing the susceptibility to SCC. ILI results from 26 pipelines showed presence of SCC out of 93 pipelines inspected using electromagnetic acoustic transducer (EMAT) and ultrasonic crack detection (UTCD) technologies. These cracks were later verified through direct examination. Besides the basic framework provided in ASME B31.8S, there were no existing criteria to prioritize the susceptible pipeline segments for the SCC threat. Therefore, Saudi Aramco conducted a comprehensive three-phase study to establish a robust integrity management plan for pipelines with SCC. This paper covers details of the third phase of the study, which is about SCC integrity management planning. Companion papers address Phases 1 and 2. The third phase of the study developed SCC integrity management plans (SCC IMPs) for pipelines with SCC based on the work completed on the first and second phases. The SCC IMPs covered SCC susceptibility profiling along pipeline segments, engineering assessment of SCC features, growth analysis, and a process to respond to the SCC threat. The SCC response strategy included further ILI plans, excavations plans, hydrotest benefit assessments and other mitigation measures, such as pipeline partial replacement and recoating. The approach of the SCC IMP will be deployed on all Saudi Aramco pipelines in the future, to prioritize SCC susceptible segments and their mitigation plans.
机译:同时存在拉伸应力,腐蚀环境和易受SCC影响的材料,会导致地下管道的应力腐蚀开裂(SCC)。 ASME B31.8S提供了确定埋藏管道的SCC敏感段的基本框架。在线检查(ILI)在行业中对于在管道上确定SCC并确定其尺寸是有效的。在制定全面的SCC完整性管理计划时,应认识到ILI工具存在一些固有的局限性。沙特阿美运营的综合管道网络长约22,000公里。 1980年前,大量的带胶带涂层的沙特阿美管道建成,从而增加了对SCC的敏感性。来自26条管道的ILI结果表明,使用电磁声换能器(EMAT)和超声裂缝检测(UTCD)技术检查的93条管道中存在SCC。这些裂缝随后通过直接检查得到了验证。除了ASME B31.8S中提供的基本框架之外,没有现有的标准可以优先考虑易受攻击的管道段以应对SCC威胁。因此,沙特阿美公司进行了一项全面的三阶段研究,以建立具有SCC的可靠的管道完整性管理计划。本文涵盖了研究的第三阶段的详细信息,该阶段与SCC完整性管理计划有关。配套文件涉及第1阶段和第2阶段。研究的第3阶段根据在第1阶段和第2阶段完成的工作,为带有SCC的管道制定了SCC完整性管理计划(SCC IMPs)。 SCC IMPs涵盖了沿管道段的SCC敏感性分析,SCC功能的工程评估,增长分析以及对SCC威胁做出响应的过程。 SCC的应对策略包括进一步的ILI计划,开挖计划,水压试验效益评估和其他缓解措施,例如管道部分更换和重涂。未来将在所有沙特阿美管道上部署SCC IMP的方法,以优先考虑易受SCC影响的细分市场及其缓解计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号