首页> 外文会议>International Conference on Clean Electrical Power >Technical and Economic Study of Two Repowered Wind Farms in Bustelo and San Xoan, 24.7MW and 15.84MW respectively
【24h】

Technical and Economic Study of Two Repowered Wind Farms in Bustelo and San Xoan, 24.7MW and 15.84MW respectively

机译:Bustelo和San Xoan,24.7MW和15.84MW的两次重新交换风电场的技术和经济研究

获取原文

摘要

This study describes the technical and economic aspects of the repowering process for the wind farms in Bustelo and S. Xoan, situated in the municipalities of Muras (Lugo) and As Pontes de Garcia Rodriguez (A Coruna), Galicia, North-Western Spain. This process was the result of a growing demand for renewable energies, facilitated by the great potential of wind energy for Galicia. Both farms were set up in 1998. The other factors they have in common - the same type of machinery, their location and a shared substation- mean they can be studied together and independently.
机译:本研究介绍了Bustelo和S. Xoan在穆拉斯市(Lugo)市中国家和Xoan的电力农场重新进程的技术和经济方面,并作为Pontes de Garcia Rodriguez(Coruna),加利西亚,西班牙西班牙。这一过程是对可再生能源需求不断增长的结果,促进了加利西亚风能的巨大潜力。两个农场都在1998年成立。他们共同的其他因素 - 相同类型的机械,其位置和共享变电站 - 意味着它们可以一起独立研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号