The Fuzzy Time-Cost-Quality-Environment Trade-off Analysis of Multi-mode Construction Systems for Large-scale Hydroelectric Projects

机译:大型水电项目多模施工系统的模糊时间成本 - 质量 - 环境折衷分析

获取原文

摘要

This paper studies the time-cost-quality-environment trade-off problem of construction project and establishes a multi-objective decision making model under a fuzzy environment. The objective functions are to minimize the total project time, total executed cost, quality defect of all activities, and the environment impact. Furthermore, a fuzzy based adaptive-hybrid genetic algorithm is developed for finding feasible solutions. Finally, Jinping-Ⅱ hydroelectric project was used as a practical example to demonstrate the practicality and efficiency of the method.
机译:本文研究了建筑项目的时间 - 质量 - 环境折衷问题,在模糊环境下建立了多目标决策模型。 目标职能是最大限度地减少项目总时间,总执行的成本,所有活动的质量缺陷以及环境影响。 此外,开发了一种基于模糊的自适应 - 混合遗传算法,用于寻找可行的解决方案。 最后,金平-Ⅱ水电项目被用作实际例子,以证明该方法的实用性和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号