首页> 外文会议>Annual SEMI Advanced Semiconductor Manufacturing Conference >Automation: Key to cycle time improvement in semiconductor manufacturing
【24h】

Automation: Key to cycle time improvement in semiconductor manufacturing

机译:自动化:半导体制造中循环时间改进的关键

获取原文

摘要

“Cycle Time Drives Everything”. The commitment of product delivery on time is paramount in any industry. It is particularly important in the brutal fast paced semi-conductor manufacturing industry due to tremendous competition in the market. Up until the manufacturing of 200mm wafers, cycle time was largely dependent on the “human” factor. With the advent of 300mm wafers, along with increasing market and customer needs it is hard to imagine semiconductor manufacturing without Factory Automation. In this paper, automation refers to direct equipment control, automated material transportation, and realtime lot dispatching. The paper focuses on implementation of automation on diffusion batch furnaces. Major work was done from the Equipment Interface (EI) perspective along with Real Time Dispatch (RTD) and the furnace software integration. Although the paper focuses on automation based on Tokyo Electron Ltd. (TEL) batch process manufacturing platform, the same logic can be applied to other batch process manufacturing systems. All batch processes as the name suggests process multiple wafers at the same time. A single batch consists of multiple types of wafers namely product wafers, monitor wafers and extra/side dummies (also referred to as fillers) each with a specific function in forming a batch. It is important how these wafers are delivered to the process tools and managed pre/post processing while maintaining safety, efficiency and productivity of the batch tool. An optimized strategy for batch preparation and dispatch showed overall 30% reduction in total dispatch time. A major part of these changes revolved around the filler wafer management which can be sub-divided based on filler wafer process counts and their thickness accumulation. Wait time improvement of 20% is seen on the tool set which use counts based filler wafers while, tool sets which use thickness accumulation based filler wafers showed 25% improvement in wait time.
机译:“循环时间驱动所有内容”。产品交付的承诺在任何行业都是至关重要的。由于市场巨大的竞争,在残酷的快节奏半导体制造业中尤为重要。直到制造200mm晶片,循环时间在很大程度上取决于“人体”因素。随着300毫米晶圆的出现,随着市场和客户需求的增加,难以想象没有工厂自动化的半导体制造。在本文中,自动化是指直接设备控制,自动化材料运输和实时批量调度。本文侧重于在扩散批炉上实施自动化。主要工作是从设备接口(EI)的角度来完成的,以及实时调度(RTD)和炉软件集成。虽然本文侧重于基于东京电子有限公司(电话)批处理制造平台的自动化,但相同的逻辑可以应用于其他批处理制造系统。所有批处理进程,作为名称建议同时处理多个晶片。单批批次由多种类型的晶片组成,即产品晶片,监测晶片和额外/侧面假(也称为填料),每个晶片(也称为填料),每个晶圆脉(也称为填料)具有形成批次的特定功能。重要的是如何将这些晶片交付到过程工具和管理前/后处理,同时保持批量工具的安全性,效率和生产率。用于批量准备和派遣的优化策略显示总调度时间减少30%。这些变化的主要部分围绕填充晶片管理围绕,可以基于填充晶片工艺计数及其厚度累积来分割。在使用基于计数的填充晶圆的工具集上可以看到20%的等待时间提高,而使用基于厚度累积的填充晶片的工具组在等待时间上显示出25%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号